Latest News
Canada Line resumes regular service
By Hannah Scott, Local Journalism Initiative reporter
Published 1:53 PST, Wed January 19, 2022
—
Regular Canada Line service has resumed between Bridgeport and Richmond-Brighouse stations, according to TransLink.
Previously, the Richmond Sentinel reported that single-track “shuttle” service would be in place between those stations through Feb. 2 during construction of the Capstan station. Due to the single-tracking, train service was available every 17 and a half minutes, compared to a regular schedule of six minutes and 40 seconds between trains.
But TransLink staff said on Twitter today that the phase of construction that required the single-tracking was completed earlier than anticipated.